DTE funded boardwalk

Boardwalk on West End of Pond

In spring of 2025 the pond was so full that the pond water covered the path on the northwest end of the pond. Michael acquired a $1,000 grant from DTE to purchase the materials to construct the boardwalk. Because this on the main loop trail a more extensive boardwalk was constructed. People should be able to cross country ski or push a stroller across the boardwalk.

Thanks for Michael B., Kim H. and Phil H. for constructing the boardwalk.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *