In spring of 2025 the pond was so full that the pond water covered the path on the northwest end of the pond. Michael acquired a $1,000 grant from DTE to purchase the materials to construct the boardwalk. Because this on the main loop trail a more extensive boardwalk was constructed. People should be able to cross country ski or push a stroller across the boardwalk.



Leave a Reply