On May 15, 2025, 8 more feet of boardwalk was added to the existing 24 feet of boardwalk south of the pond. Need about 16 more feet of boardwalk to finish the section.

On May 25, 2025, 8 more feet of boardwalk was added to the existing 32 feet of boardwalk south of the pond. Need about 8 more feet of boardwalk to finish the section.
Leave a Reply